Demo site

This is a demo, not a real business

Ridgeline Excavation is made up. I designed and built this site to show trade businesses what GradyBuilt can make for them.

Everything works the way it would on a real site: the menu, the buttons and the forms. Nothing you type is sent anywhere, and the phone numbers aren’t real.

Grady · GradyBuilt

Two Ridgeline excavators on a ridge at dusk, finishing a foundation dig.

Excavation & site work · NorthwestNW Arkansas

We get the ground ready.

Foundations, driveways, land clearing, ponds, septic and more, for homeowners, builders and developers across Northwest Arkansas. Our own crew, our own machines, and a fixed price in writing before we start.

  • 4.9 from 186 reviews
  • 15 years · 1,800+ jobs
  • Licensed AR #0412
  • $2M insured
  • 10 machines, all owned

Recent work

Recent jobs. What each one took.

Foundations on steep lots, drives through the woods, ponds that hold water and a few new streets. Here’s what we did on some of this year’s jobs.

Excavator lifting a bucket of red clay on a wooded hillside lot while the owners watch.

Fayetteville · Foundation

Walkout basement on a 22% slope

What it took

  • 1,400 cubic yards dug and hauled off a wooded hillside
  • Limestone at 4 ft, broken out with the hammer
  • Footings cut level for the county inspector
  • Backfilled in lifts and graded once the walls cured
On site
6 days
Machines
R-01R-03R-07
Excavator and loader cutting a new street through red clay and rock.
Subdivision

Centerton

22-lot subdivision, streets and lots

Cleared and graded 9 acres, cut the street subgrade, laid storm pipe and base rock, and graded every lot to drain.

7 weeks, in three phases

New gravel driveway under trees at sunset.
Driveway

Garfield

Quarter-mile gravel drive through the woods

Cleared the lane, cut ditches both sides, set two culverts, then 6" of base rock and 2" of top rock, crowned and rolled.

4 days on site

Aerial view of a finished farm pond with fall trees.
Pond

Gentry

1.2-acre pond with a clay-core dam

Dug the basin 14 ft deep, keyed a clay core into the dam, set the overflow pipe and spillway, and seeded the banks.

12 days on site

Crew setting a new septic tank from a crane truck.
Septic

Pea Ridge

Aerobic septic on a rocky lot

Soil test and county permit, tank set from the crane truck, a drip field laid around the rock, then inspection and seed.

3 days on site

Excavator tearing down an old two-story house.
Demolition

Rogers

Teardown and a new foundation dig

Took down a 1950s house, hauled it to a licensed landfill, pulled the old footings and dug the new foundation.

5 days on site

Dozer clearing a wooded lot with rock showing.
Land clearing

Cave Springs

4 acres cleared, no burn piles

Flagged the oaks the owners wanted to keep, mulched the rest, ground the stumps flush, then seed and straw.

3 days on site

Swipe for more jobs

Job explorer

Pick your job. See what it takes.

What we do, day by day, with the price range and the machines we bring. Your bid will have the same lines.

Foundations, house pads & basements

Slab, crawl space or full basement, dug to your plans and backfilled once the walls are up. Walkout basements on sloped lots are a big part of our work.

Aerial view of a new house foundation: the footprint dug, footings cut and forms set, ready for the pour.
A slab foundation from above: dug, footings cut, forms set and ready for the concrete crew.

Day by day

  1. Before Utility locate called in. We check your builder’s stakes
  2. Day 1 Silt fence and a rock entrance. Strip and stockpile the topsoil
  3. Days 2–3 Dig to plan depth, cut the footings level, haul the spoil
  4. After the walls Drain rock, backfill in lifts, rough grade away from the house

What’s included

  • Utility locate called in before we dig
  • Silt fence and a rock construction entrance
  • Dig to plan depth, with room for the forms
  • Footings cut level, ready for inspection
  • Drain rock and backfill in lifts after the walls
  • Rough grade sloped away from the house

Subdivisions & site prep

Streets, storm pipe and lots for builders and developers. We bid from your civil plans and phase the work with your build schedule.

Excavator and loader cutting a new street through red clay and rock.
A new street cut through red clay and rock, before the storm pipe and base rock go in.

Phase by phase

  1. Phase 1 Clearing, erosion control, mass grading
  2. Phase 2 Storm pipe and street subgrade
  3. Phase 3 Base rock on the streets, lot grading
  4. Phase 4 Final grade and seed, ready for paving and houses

What’s included

  • Erosion control and stormwater inspections
  • Clearing and mass grading to plan
  • Storm pipe and inlets
  • Street subgrade and base rock, ready for paving
  • Every lot graded to drain
  • As-built grades for your engineer

Driveways & culverts

Gravel drives that shed water and don’t rut. Culverts sized for the ditch, not guessed.

Cross-section
ACROSS THE DRIVE CROWN CULVERT, SIZED TO THE DITCH COUNTY ROAD 2" TOP ROCK OVER 6" BASE ROCK FABRIC ON SOFT SPOTS ROAD DITCH LIMESTONE

Swipe to see the whole drive

  • Finished grade
  • Top rock
  • Base rock
  • Fabric
  • Culvert

Day by day

  1. Day 1 Clear, strip, cut ditches, set culverts
  2. Day 2 Base rock, roll
  3. Day 3 Top rock, crown, final roll

What’s included

  • Ditches both sides
  • Culvert pipe at each crossing
  • Fabric on soft spots
  • 6" base rock + 2" top rock
  • Crowned and rolled

Land clearing

Mulched or hauled off. You walk it with us first and flag the trees you keep.

Cross-section
NO BURN PILES BEFORE BRUSH AND TREES UP TO 8" AFTER KEEP-TREE, FLAGGED WITH YOU MULCH LEFT IN PLACE STUMPS GROUND FLUSH LIMESTONE

Swipe to see before and after

  • Finished grade
  • Mulch
  • Keep-tree flag
  • Stumps

Day by day

  1. Day 1 Walk and flag keep-trees with you
  2. Days 1–2 Mulch or push and haul
  3. Last day Grind or pull stumps, rake, seed

What’s included

  • Keep-trees flagged with you
  • Brush and trees up to 8" mulched
  • Stumps ground flush or pulled
  • No burn piles
  • Seed and straw on bare ground

Ponds

Ponds that hold water. We test for clay before we bid, and key the dam into it.

Cross-section
TH-1 · CLAY AT 3 FT WATER LINE BASIN DUG 14 FT DAM · 8" LIFTS CLAY CORE, KEYED IN OVERFLOW PIPE LIMESTONE

Swipe to see the whole pond

  • Finished grade
  • Water
  • Dam, 8" lifts
  • Clay core
  • Test hole

Day by day

  1. Days 1–2 Clear, strip, test for clay
  2. Days 3–8 Dig the basin, cut the core trench
  3. Days 9–11 Build the dam in lifts, set the overflow pipe
  4. Day 12 Spillway, seed and straw

What’s included

  • Clay test holes
  • Keyed clay core
  • Dam compacted in 8" lifts
  • Overflow pipe and emergency spillway
  • Seed and straw on the dam

Septic systems

New systems, replacements and repairs. We handle the soil test and the county permit.

Cross-section
SOIL TEST PIT HOUSE RISERS AND LIDS AT GRADE DRAIN FIELD: ROCK AND PIPE TANK SLOPED LINE LIMESTONE

Swipe to see the whole system

  • Finished grade
  • Tank
  • Drain rock
  • Pipe
  • Test pit

Day by day

  1. Before Soil test and permit (2–4 weeks)
  2. Day 1 Dig tank hole and lines
  3. Day 2 Set tank, lay field
  4. Day 3 Inspection, backfill, seed

What’s included

  • Soil test with a state-licensed designer
  • County health permit
  • Tank, lines and field
  • Inspection
  • Backfill, seed and straw
  • 5-year workmanship warranty

Demolition

Houses, barns, pools and slabs. Down, hauled, and graded so you can build.

Cross-section
READY TO BUILD OLD HOUSE, DOWN AND HAULED OFF TO A LICENSED LANDFILL FILL IN COMPACTED LIFTS OLD FOOTINGS OUT WATER LINE, CAPPED LIMESTONE

Swipe to see the whole lot

  • Finished grade
  • Fill, compacted lifts
  • Taken out
  • Capped line

Day by day

  1. Before Utility shutoffs confirmed, asbestos check if needed
  2. Day 1 Tear down, sort metal
  3. Day 2 Haul off, pull foundation
  4. Day 3 Fill and grade

What’s included

  • Utility shutoff check
  • Asbestos survey arranged if the house needs one
  • Haul-off to a licensed landfill
  • Foundation and footings out
  • Fill, grade, ready to build

How we bid

A fixed price, in writing.

Northwest Arkansas is red clay over chert and limestone, and you can’t see it from the road. So we walk every job before we put a number on it.

  1. 01

    A free site walk on every job. We check slope, drainage, access and the soil, then send your bid in writing.

  2. 02

    Test holes when it matters. On foundations, ponds and septic, ask and we’ll dig 2–3 test holes during the walk, so what’s underground is in the price.

  3. 03

    Nothing extra without your OK. If the ground surprises us, you get the cost by text before we do the work.

Excavator bucket in the foreground, operator in the cab, on a wooded lot.

48 hrsfrom the site walk to your written bid

Price guide

Typical prices, before we see your lot.

Real ranges from our 2025–26 jobs across Northwest Arkansas. Your firm price comes in writing after the site walk.

JobTypical priceTime on siteIncludes

Foundation dig, slab or crawl spacePer house, 2,000–3,500 sq ft

$3,500–$9,000

2–3 days

Footings dug, spoil spread or hauled, backfill, rough grade

Basement dig, full or walkoutPer house, 2,000–3,500 sq ft

$10,000–$28,000

3–5 days, 2 trips

Dig with room for forms, footings, drain rock, backfill in lifts

Gravel drivewayPer foot, 12 ft wide. From $4,500

$22–$34 / ft

1–3 days

6" base rock, 2" top rock, crown and ditches

Driveway culvertPer crossing

$1,400–$2,800

Half a day

Pipe, bedding, rock headwalls

Land clearing, mulchedPer acre

$2,200–$4,800 / ac

½–1 day per acre

Brush and trees mulched, stumps ground flush

Land clearing, fullPer acre

$5,500–$9,000 / ac

1–2 days per acre

Stumps pulled, everything hauled off

Pond¼–1½ acres of water

$12,000–$45,000

1–3 weeks

Clay test, keyed dam, overflow pipe, spillway, seed

Septic, conventional3-bedroom home

$7,800–$12,500

2–3 days after permit

Soil test, permit, tank, lines, field, inspection

Septic, alternativeAerobic or drip, for rock or tight lots

$14,000–$24,000

3–4 days after permit

Everything above, plus the treatment unit

Septic repairPer repair

From $1,800

1 day

Lines, baffles, risers, lids

DemolitionPer house. Outbuildings and pools from $2,500

$9,000–$20,000

1–3 days

Haul-off to a licensed landfill, old footings out, fill and grade

Drainage or regradePer job

$2,500–$9,000

1–2 days

French drains, swales, grade away from the house

Utility trenchBy length and depth

$9–$22 / ft

1–2 days

Water line, electric conduit, gas sleeve

Subdivision site workStreets, storm pipe and lots, from civil plans

By bid

Phased with your build

Clearing, mass grading, street subgrade and base rock, storm pipe, lot grading

Ridgeline’s 10-ton roller compacting a building site at sunset.

How it works

From first call to your foundation.

  1. Same day

    1

    You call, text or send the form

    We call back the same business day. Requests after 3 pm get a call by 9 the next morning.

  2. Within 3 business days

    2

    Site walk

    We check your builder’s stakes, look at slope, drainage and access, and dig test holes if you want them.

  3. 48 hours after the walk

    3

    Written fixed bid

    Line items, the schedule, how we handle rock, and what’s not included.

  4. Usually 1–3 weeks out

    4

    Dig days

    Silt fence goes up first. You get a text with photos every evening at 5.

  5. Last day

    5

    Final walk

    Backfill and rough grade, cleanup, seed and straw. Then you pay the balance.

Ridgeline operator in an 8-ton excavator, digging a septic trench.

R-02 · Septic trench, Garfield

The crew and the iron

Nine people. Ten machines. All ours.

Travis Mabry ran a dozer for the county road department for nine years. In 2011 he bought a used 9-ton dozer and a trailer and started Ridgeline from his yard off Highway 71. Fifteen years later it’s nine people and ten machines, and Travis still walks every job before we bid it.

“Most of our work is repeat builders. We show up when we say we will.”

Travis Mabry, owner
  • 6 operators, average 11 years in the seat
  • Drug-tested, OSHA 10-trained, background-checked
  • Workers’ comp on every crew member
  • We grade youth ball fields around Benton County every spring

The fleet

Owned, not rented. Serviced in our own shop, so a breakdown is a day, not a week. Plus a hydraulic rock hammer that fits R-01 and R-02.

  • R-0121-ton excavatorFoundations, basements, ponds
  • R-028-ton excavatorSeptic, trenches, tight lots
  • R-033.5-ton mini excavatorTest holes, backyards, drainage
  • R-0413-ton dozer, GPS gradeSubdivisions, ponds, driveways
  • R-059-ton dozerDriveways, clearing, finish grade
  • R-06Track loader + mulcherLand clearing
  • R-07Track loader + forksRock, pipe, finish grading
  • R-0810-ton rollerBackfill, streets, driveway base
  • R-09Tri-axle dump truckRock in, spoil out
  • R-10Lowboy and tractorMoving the machines

4.9

from 186 Google reviews
97% five stars

Reviews

What the neighbors say.

Read all 186 reviews
“They dug two test holes before they’d give me a number. Hit rock right where they said. The bill matched the bid to the dollar.”
Dana W.Fayetteville · Walkout basement · Aug 2026
“I build 14 houses a year. Ridgeline is the only dirt crew I don’t have to chase. Footings are on grade, and they’re back to backfill the week the walls cure.”
Marcus T.Centerton · Builder, 9 foundations · 2025–26
“A quarter-mile of drive through woods, two culverts, four days. The county road was cleaner when they left than when they came.”
Kyle R.Garfield · Driveway · Jun 2026
“Hit more rock than anyone expected. They texted me the cost before they ran the hammer, and I okayed it from work. No games.”
Luis M.Pea Ridge · Septic · Sep 2026
“Our septic failed the week we listed the house. They had a crew out in two days and walked me through the county permit. The buyer never blinked.”
Angela P.Gravette · Septic replacement · Mar 2026
“The pond held water by the first fall. Clay core, just like he drew it on the bid.”
Ron and Beth H.Gentry · 1.2-acre pond · Oct 2025
“Four acres mulched, no burn piles, done in three days. Two neighbors asked for his number.”
Shannon K.Cave Springs · Land clearing · Jan 2026
“Tore down my mom’s old house and had the new foundation dug by Friday. I live in Tulsa, so the evening photos were everything.”
Jordan B.Rogers · Teardown and foundation · Apr 2026

Service area

Serving the 3-state area.

KANSASOKLAHOMAMISSOURIARKANSAS I-49US 412 Bentonville Rogers Springdale Fayetteville Siloam Springs Gentry Gravette Pea Ridge Centerton Garfield Eureka Springs Huntsville Pineville Neosho Joplin Cassville Grove Jay OUR YARD

Swipe to see the whole map

  • Our yard
  • Most of our work
  • Also serving

Most of our work is in Benton and Washington counties. We also cross the state lines into southwest Missouri and northeast Oklahoma, and go farther for the right job.

Arkansas Most of our work

  • Bella Vista
  • Bentonville
  • Rogers
  • Springdale
  • Fayetteville
  • Centerton
  • Pea Ridge
  • Lowell
  • Cave Springs
  • Gravette
  • Gentry
  • Siloam Springs
  • Garfield
  • Eureka Springs
  • Huntsville

Missouri

  • Joplin
  • Neosho
  • Pineville
  • Noel
  • Jane
  • Cassville

Oklahoma

  • Grove
  • Jay
  • Colcord
  • Westville
Ask about your town

Not listed? Call anyway. If we can get the machines there, we’ll bid it.

Questions

Before we dig.

Still asking?

Call or text Travis.

(479) 555-0142

Office open 6:30 am–6 pm

Cost

Is the bid really free?

Yes. The site walk is free, and so are test holes if your job needs them. Moving the machines is free on most jobs in Benton and Washington counties. Farther out, it’s a line on the bid.

Do I pay up front?

30% gets you on the schedule. The balance is due at the final walk. Check, card or ACH. Builders get net-30 after the first job.

What if you hit rock?

It happens a lot here. If test holes found it, it’s already in the price. If not, hammer time runs $185 an hour, and we text you the cost before we start.

Ground

Will the backfill settle?

We backfill in 8-inch lifts and compact every one, so it doesn’t sink around your walls. Fill under a slab gets a third-party density test. Every job carries a 2-year settlement warranty.

Do you pour concrete or build walls?

No concrete, no asphalt. We dig and backfill, and your foundation crew pours. Block or boulder walls up to 4 ft. Taller walls need an engineer, and we’ll tell you who we trust.

Timing

How soon can you start?

Most jobs start 1–3 weeks after you sign. Failed septic systems and storm washouts jump the line.

Do you work for builders and developers?

It’s about half our work. Builders get net-30 after the first job. We bid subdivisions from the civil plans and run the clearing, streets, storm pipe and lots in phases.

What about rain?

Wet clay won’t compact, so we wait it out instead of rushing it. Rain days never change your price.

Mess and permits

Who handles permits?

We handle the septic soil test and county permit, and the stormwater permit if your site needs one. Building permits stay with you or your builder.

Will you tear up my yard or the road?

Silt fence goes up on day one. We scrape the road every evening, and we seed and straw everything we touched on the way out.

Do you haul off the trees?

Your choice. Mulched in place costs less. Pulled and hauled off leaves bare ground ready to build.

Get a bid

Get a fixed bid.

Four quick steps. Travis or the office calls you back today.

  1. 1We call you back the same business day.
  2. 2Free site walk within 3 business days.
  3. 3Your written fixed bid 48 hours after the walk.

Rather talk?

(479) 555-0142

Texts and photos welcome.

  1. 1Job
  2. 2Site
  3. 3Timing
  4. 4You
What’s the job?

Pick all that apply.

Step 1 of 4

Tell us about the site.

How big?

How steep?

How do we get in?

Rock you know about?

Need trenching for utilities?

Step 2 of 4

When do you need it?

When to start?

Do you own the land?

Is a builder involved?

Step 3 of 4

Where do we call you?

Step 4 of 4

Got it, Dana. Request #2611.

Travis or the office calls you back today from (479) 555-0142. Sent after 3 pm? By 9 the next morning.

  1. TodayCallback, about 10 minutes
  2. Within 3 business daysFree site walk
  3. 48 hours after the walkYour fixed bid, in writing

Save our number. We text photos from the site every evening.

Free. No obligation. We call back today, and we don’t share your number with anyone.